Helical Piers Installation

Helical Piers Installation for Abraham Lincoln
High School Addition

Limited working space. Four columns requiring temporary support

Limited working space. Four columns requiring temporary support

Advancing helical piers adjacent to existing column footings

Advancing helical piers adjacent to existing column footings

Advancing helical piers adjacent to existing column footings

Advancing helical piers adjacent to existing column footings

Hydraulic cylinders to apply load to the piers

Hydraulic cylinders to apply load to the piers

Commercial Foundation Repair

Project: Abraham Lincoln High School Addition
Location: Council Bluffs, IA
Date: March 2009

Problem

The Abraham Lincoln High School was built in 1960 with construction consisting of poured concrete foundations, steel framing and masonry block walls. A renovation and three additions were planned in 2009. With the planned additions, excavations would be made around and below four existing exterior column footings for utility installation and placement of new wall footings. These columns would therefore require temporary support during construction to prevent settlement/movement of the columns and damage to the existing structure.

Test borings completed for the project extended to depths of 15 to 25 feet and encountered lean clay fill to depths of 4 to 19 feet over native lean clay and silt (Peoria loess). The consistency of the native soils was described as firm to hard. Groundwater was not encountered in the test borings.

Solution

Helical piers were selected to provide temporary support for the four columns. The design included 16 piers, four on each column, and each pier to support a design working load of 20 kips. The helical pier configuration consisted of 2 7/8-inch OD by 0.276-inch wall hollow round shaft with 10"-12"-14" triple-helix lead sections.

With their past experience installing helical piers within and through the silty Peoria loess, they anticipated pier depths greater than the depths of the soil borings. The piers were advanced to average depths of 33 feet in order to generate installation torques correlating to ultimate pier capacities of at least 40 kips (FOS ≥ 2). Retrofit brackets were set and the design loads were applied to the piers with hydraulic cylinders.

Structural Products Installed: (16) Supportworks Model 288 Helical Piers, 10"-12"-14" Lead Section, Installed to an average depth of 33 feet, 20 kip Design Load

Read Some of Our Other Case Studies

Helical Tiebacks

March 2010
Tallahassee, FL
Read More

Helical Piles

June 2010
Orland Park, IL
Read More

Push Piers

May 2009
Menasha, WI
Read More

Looking for a price? Get a no cost, no obligation free estimate.